Langan Engineering appeared before the Lodi Planning
Board on behalf of the proposed warehouse projects.
The engineer had been meeting privately with Paparozzi
after the hearings already began.
People that gave to Gary always got a big return on their investment.
Link to one of the many campaign contribution reports
for Paparozzi/Schrieks while Gary Paparozzi was mayor: