$400,000 for architectural fees. No SDA grants. All local funds(Lodi tax dollars). No
referendum vote.
Please read pages 7 to 11 of the link below:
This was never disclosed to those in attendance at the
November meeting. There needs to be an
investigation!
How are things like this taking place in the year
2015?